🎁 Get the FREE AI Skills Starter GuideSubscribe →
BytesAgainBytesAgain
🦀 ClawHub

4To1 Planner - AI Planning Coach

by @qingxuantang

AI planning coach using the 4To1 Method™ — turn 4-year vision into daily action. Connects to Notion, Todoist, Google Calendar, or local Markdown. Use when user wants to plan goals, do weekly reviews, track projects, or set up a planning system.

Versionv2.0.0
Downloads2,006
Installs5
TERMINAL
clawhub install 4to1-planner

📖 About This Skill


name: 4to1-planner description: AI planning coach using the 4To1 Method™ — turn 4-year vision into daily action. Connects to Notion, Todoist, Google Calendar, or local Markdown. Use when user wants to plan goals, do weekly reviews, track projects, or set up a planning system. user-invocable: true homepage: https://4to1planner.com metadata: {"openclaw":{"emoji":"🎯","requires":{"anyBins":["curl","python3"]},"homepage":"https://4to1planner.com"}}

4To1 Planner — AI Planning Coach

> "From Vision to Action: 4to1"

An AI-native planning coach that turns your 4-year vision into today's action — through conversation, not templates.

The 4To1 Method™

A 4-layer strategic planning system. Each layer bridges the gap between vision and execution:

4 YEARS  →  Strategic Vision     (Where am I going?)
3 MONTHS →  Project Milestones   (Quarterly Gantt Log)
2 WEEKS  →  Action Execution     (1 Day in a Week sprints)
1 DAY    →  Daily Tasks          (Today's to-do list)

Plus two elimination layers:

  • Not-To-Do Projects: Things you explicitly say NO to
  • Time Wasters: Daily habits you're eliminating
  • Core principle: Every daily task connects to a 2-week sprint, which connects to a 3-month milestone, which connects to your 4-year vision. Nothing floats.

    Quick Start

    User says any of these → this skill activates:

  • "Help me set up a planning system"
  • "I want to plan my next 4 years"
  • "Do my weekly review"
  • "What should I focus on today?"
  • "Set up 4to1 planner"
  • Setup: Connect Your Backend

    The planner needs somewhere to store plans. Ask the user which they prefer:

    Option 1: Notion (Recommended)

    # 1. Create a Notion integration at https://www.notion.so/my-integrations
    

    2. Copy the API key (starts with ntn_)

    3. Store it:

    mkdir -p ~/.config/4to1 echo "BACKEND=notion" > ~/.config/4to1/config echo "NOTION_API_KEY=ntn_your_key_here" >> ~/.config/4to1/config

    Share a parent page with the integration in Notion (click ··· → Connections → select your integration).

    Create the planning workspace in Notion:

    NOTION_KEY=$(grep NOTION_API_KEY ~/.config/4to1/config | cut -d= -f2)
    PARENT_PAGE=$(grep NOTION_PARENT_PAGE ~/.config/4to1/config | cut -d= -f2)

    Create the 4To1 Planning Hub page

    curl -s -X POST "https://api.notion.com/v1/pages" \ -H "Authorization: Bearer $NOTION_KEY" \ -H "Notion-Version: 2025-09-03" \ -H "Content-Type: application/json" \ -d "{ \"parent\": {\"page_id\": \"$PARENT_PAGE\"}, \"properties\": {\"title\": {\"title\": [{\"text\": {\"content\": \"🎯 4To1 Planning Hub\"}}]}}, \"children\": [ {\"type\": \"heading_1\", \"heading_1\": {\"rich_text\": [{\"text\": {\"content\": \"🔭 4-Year Vision\"}}]}}, {\"type\": \"paragraph\", \"paragraph\": {\"rich_text\": [{\"text\": {\"content\": \"Your strategic direction. Updated annually.\"}}]}}, {\"type\": \"heading_1\", \"heading_1\": {\"rich_text\": [{\"text\": {\"content\": \"📊 3-Month Milestones\"}}]}}, {\"type\": \"paragraph\", \"paragraph\": {\"rich_text\": [{\"text\": {\"content\": \"Quarterly Gantt Log — project milestones for this quarter.\"}}]}}, {\"type\": \"heading_1\", \"heading_1\": {\"rich_text\": [{\"text\": {\"content\": \"🏃 2-Week Sprint\"}}]}}, {\"type\": \"paragraph\", \"paragraph\": {\"rich_text\": [{\"text\": {\"content\": \"1 Day in a Week — action execution in 2-week cycles.\"}}]}}, {\"type\": \"heading_1\", \"heading_1\": {\"rich_text\": [{\"text\": {\"content\": \"🚫 Not-To-Do List\"}}]}}, {\"type\": \"paragraph\", \"paragraph\": {\"rich_text\": [{\"text\": {\"content\": \"Projects and commitments you are explicitly saying NO to.\"}}]}}, {\"type\": \"heading_1\", \"heading_1\": {\"rich_text\": [{\"text\": {\"content\": \"⏰ Time Wasters\"}}]}}, {\"type\": \"paragraph\", \"paragraph\": {\"rich_text\": [{\"text\": {\"content\": \"Daily habits you are eliminating.\"}}]}} ] }"

    Create Projects database (tracks items across all 4 layers)

    curl -s -X POST "https://api.notion.com/v1/databases" \ -H "Authorization: Bearer $NOTION_KEY" \ -H "Notion-Version: 2025-09-03" \ -H "Content-Type: application/json" \ -d "{ \"parent\": {\"page_id\": \"$PARENT_PAGE\"}, \"title\": [{\"text\": {\"content\": \"📋 4To1 Projects\"}}], \"properties\": { \"Name\": {\"title\": {}}, \"Status\": {\"select\": {\"options\": [ {\"name\": \"Active\", \"color\": \"green\"}, {\"name\": \"Planned\", \"color\": \"blue\"}, {\"name\": \"On Hold\", \"color\": \"yellow\"}, {\"name\": \"Done\", \"color\": \"gray\"}, {\"name\": \"Not-To-Do\", \"color\": \"red\"} ]}}, \"Layer\": {\"select\": {\"options\": [ {\"name\": \"4-Year Vision\", \"color\": \"blue\"}, {\"name\": \"3-Month Milestone\", \"color\": \"green\"}, {\"name\": \"2-Week Sprint\", \"color\": \"orange\"}, {\"name\": \"1-Day Task\", \"color\": \"red\"} ]}}, \"Priority\": {\"select\": {\"options\": [ {\"name\": \"Primary\", \"color\": \"red\"}, {\"name\": \"Secondary\", \"color\": \"orange\"}, {\"name\": \"Nice-to-have\", \"color\": \"gray\"} ]}}, \"Parent Project\": {\"rich_text\": {}}, \"Start Date\": {\"date\": {}}, \"End Date\": {\"date\": {}}, \"Progress\": {\"number\": {\"format\": \"percent\"}}, \"Notes\": {\"rich_text\": {}} } }"

    Create Sprint Log database (2-week tracking cycles)

    curl -s -X POST "https://api.notion.com/v1/databases" \ -H "Authorization: Bearer $NOTION_KEY" \ -H "Notion-Version: 2025-09-03" \ -H "Content-Type: application/json" \ -d "{ \"parent\": {\"page_id\": \"$PARENT_PAGE\"}, \"title\": [{\"text\": {\"content\": \"📅 Sprint Log\"}}], \"properties\": { \"Sprint\": {\"title\": {}}, \"Focus Areas\": {\"rich_text\": {}}, \"Completed\": {\"number\": {}}, \"Planned\": {\"number\": {}}, \"Completion Rate\": {\"formula\": {\"expression\": \"if(prop(\\\"Planned\\\") > 0, round(prop(\\\"Completed\\\") / prop(\\\"Planned\\\") * 100), 0)\"}}, \"Reflection\": {\"rich_text\": {}}, \"Energy Level\": {\"select\": {\"options\": [ {\"name\": \"🔥 High\", \"color\": \"green\"}, {\"name\": \"😊 Normal\", \"color\": \"blue\"}, {\"name\": \"😴 Low\", \"color\": \"yellow\"}, {\"name\": \"💀 Burnt Out\", \"color\": \"red\"} ]}} } }"

    Option 2: Todoist

    # 1. Get API token from https://app.todoist.com/app/settings/integrations/developer
    echo "BACKEND=todoist" > ~/.config/4to1/config
    echo "TODOIST_API_KEY=your_token_here" >> ~/.config/4to1/config
    

    Create the 4To1 structure:

    TODOIST_KEY=$(grep TODOIST_API_KEY ~/.config/4to1/config | cut -d= -f2)

    for project in "🔭 4-Year Vision" "📊 3-Month Milestones" "🏃 2-Week Sprint" "✅ Daily Tasks" "🚫 Not-To-Do"; do curl -s -X POST "https://api.todoist.com/rest/v2/projects" \ -H "Authorization: Bearer $TODOIST_KEY" \ -H "Content-Type: application/json" \ -d "{\"name\": \"$project\"}" done

    Option 3: Google Calendar + Tasks

    echo "BACKEND=gcal" > ~/.config/4to1/config
    

    Requires Google OAuth — run the setup script:

    python3 {baseDir}/scripts/gcal_setup.py

    Option 4: Local Markdown (No account needed)

    echo "BACKEND=local" > ~/.config/4to1/config
    echo "LOCAL_DIR=~/4to1-plans" >> ~/.config/4to1/config
    mkdir -p ~/4to1-plans/{vision,milestones,sprints,daily,not-to-do}
    

    Core Commands

    1. Onboarding — "Set up my planning system"

    Guide the user through this conversation:

    Step 1: Choose backend (see Setup above)

    Step 2: 4-Year Vision (5-10 min conversation)

    Ask one at a time, conversationally: 1. "If you could be anywhere in 4 years — career, life, skills — what does that look like?" 2. "What are the 2-3 biggest areas you want to transform?" (career, health, relationships, skills, finances) 3. "For each area, what does SUCCESS look like in 4 years? Be specific." 4. "What are you willing to give up to get there?" → seeds the Not-To-Do list 5. "Any daily habits stealing your time?" → seeds the Time Wasters list

    After the conversation, create:

  • 4-Year Vision document with their answers (Layer: 4-Year Vision)
  • 2-5 vision areas with concrete success criteria
  • Initial Not-To-Do list + Time Wasters list
  • Step 3: 3-Month Milestones (5 min) 1. "Of your vision areas, which 1-2 need the most progress in the next 3 months?" 2. "What specific milestones would mean real progress?" 3. "Break each into measurable deliverables."

    Create items with Layer: 3-Month Milestone, linked to vision areas.

    Step 4: 2-Week Sprint (3 min) 1. "For your quarterly milestones, what can you accomplish in the next 2 weeks?" 2. "Pick 2 Primary projects and up to 5 Secondary projects." 3. "What does 'done' look like for each?"

    Create items with Layer: 2-Week Sprint.

    Step 5: Today (1 min) 1. "What are the 3 most important tasks for today?" 2. "Which sprint project does each serve?"

    Write everything to the chosen backend.

    2. Weekly Review — "Do my weekly review"

    Run every Sunday evening or Monday morning. Read {baseDir}/scripts/weekly_review.md for the full template.

    Summary:

    READ: This week's tasks + completion status + project progress + Not-To-Do list
    ASK:  How did this week go? → Wins? → Blockers? → Energy level?
          → Did you spend time on Not-To-Do items? → Next week's top 3?
    WRITE: Sprint log entry + next week's tasks + updated progress
    

    Keep it under 10 minutes. Be a coach, not a form.

    3. Bi-Weekly Sprint Review — Every 2 weeks

    READ: Current 2-week sprint tasks and progress
    REVIEW: What got done? What carries over? Any sprint goal changes?
    PLAN: Next 2-week sprint — new primary/secondary projects
    CHECK: Are sprints still aligned with 3-month milestones?
    

    4. Quarterly Review — End of each quarter

    READ: All projects and sprint logs for the quarter
    REPORT: Projects completed/stalled/abandoned, completion trend, top win, biggest blocker
    ASK: Which projects continue? Which get cut? New projects? Update Not-To-Do?
    WRITE: Quarterly report + next quarter's milestones
    

    5. Daily Check-in — "What should I focus on today?"

    READ: Current sprint tasks + project priorities
    RESPOND:
      "Based on your 2-week sprint, today's focus:
       1. [Task] → serves [3-month milestone]
       2. [Task] → serves [milestone]
       3. [Task]

    ⚠️ [Project X] hasn't had progress in a week. 🚫 Not-To-Do reminder: You said NO to [thing]."

    6. Quick Add — "Add [task] to my plan"

    Parse the task. Ask which project/sprint it serves if unclear. Add to backend with correct layer linkage.

    7. Progress Check — "How am I doing?"

    READ: All data
    SHOW:
      🔭 4-Year Vision: [areas and direction]
      📊 Q[X] Milestones: [X/Y complete]
      🏃 Current Sprint: [X/Y tasks done, Z% rate]
      📈 Sprint streak: X consecutive reviews
      🚫 Not-To-Do violations: [any this week?]
    

    Notion API Reference

    NOTION_KEY=$(grep NOTION_API_KEY ~/.config/4to1/config | cut -d= -f2)

    Search planning pages

    curl -s -X POST "https://api.notion.com/v1/search" \ -H "Authorization: Bearer $NOTION_KEY" \ -H "Notion-Version: 2025-09-03" \ -H "Content-Type: application/json" \ -d '{"query": "4To1"}'

    Query projects by layer

    curl -s -X POST "https://api.notion.com/v1/databases/{db_id}/query" \ -H "Authorization: Bearer $NOTION_KEY" \ -H "Notion-Version: 2025-09-03" \ -H "Content-Type: application/json" \ -d '{"filter": {"and": [ {"property": "Status", "select": {"equals": "Active"}}, {"property": "Layer", "select": {"equals": "2-Week Sprint"}} ]}}'

    Update progress

    curl -s -X PATCH "https://api.notion.com/v1/pages/{page_id}" \ -H "Authorization: Bearer $NOTION_KEY" \ -H "Notion-Version: 2025-09-03" \ -H "Content-Type: application/json" \ -d '{"properties": {"Progress": {"number": 0.75}, "Status": {"select": {"name": "Active"}}}}'

    Create sprint log entry

    curl -s -X POST "https://api.notion.com/v1/pages" \ -H "Authorization: Bearer $NOTION_KEY" \ -H "Notion-Version: 2025-09-03" \ -H "Content-Type: application/json" \ -d '{ "parent": {"database_id": "{sprint_log_db_id}"}, "properties": { "Sprint": {"title": [{"text": {"content": "2026-W07 Sprint Review"}}]}, "Completed": {"number": 8}, "Planned": {"number": 10}, "Reflection": {"rich_text": [{"text": {"content": "Good sprint. Hit main milestones."}}]}, "Energy Level": {"select": {"name": "😊 Normal"}} } }'

    Todoist API Reference

    TODOIST_KEY=$(grep TODOIST_API_KEY ~/.config/4to1/config | cut -d= -f2)

    Get all projects

    curl -s "https://api.todoist.com/rest/v2/projects" -H "Authorization: Bearer $TODOIST_KEY"

    Get active tasks in a project

    curl -s "https://api.todoist.com/rest/v2/tasks?project_id={id}" -H "Authorization: Bearer $TODOIST_KEY"

    Create task linked to sprint

    curl -s -X POST "https://api.todoist.com/rest/v2/tasks" \ -H "Authorization: Bearer $TODOIST_KEY" -H "Content-Type: application/json" \ -d '{"content": "Task name", "project_id": "xxx", "priority": 4, "due_string": "next monday", "description": "Sprint: 2-Week Sprint | Milestone: Q1 Goal"}'

    Complete task

    curl -s -X POST "https://api.todoist.com/rest/v2/tasks/{id}/close" -H "Authorization: Bearer $TODOIST_KEY"

    Local Markdown Backend

    ~/4to1-plans/
    ├── vision.md            # 4-year vision document
    ├── not-to-do.md         # Not-To-Do projects + Time Wasters
    ├── milestones/
    │   └── 2026-Q1.md       # 3-month milestone plan
    ├── sprints/
    │   ├── 2026-W07.md      # 2-week sprint plan
    │   └── 2026-W09.md
    ├── daily/
    │   └── 2026-02-10.md    # Daily task list
    └── reviews/
        ├── sprint-2026-W07.md  # Sprint review log
        └── quarterly-2026-Q1.md
    

    Use YAML frontmatter for structured data:

    ---
    project: Launch MVP
    layer: 3-month-milestone
    status: active
    priority: primary
    progress: 45
    start: 2026-01-01
    end: 2026-03-31
    parent_vision: "Build a profitable SaaS"
    

    Launch MVP

    Tasks (2-week sprint)

  • [x] Define feature scope
  • [x] Build prototype
  • [ ] User testing round 1
  • [ ] Iterate on feedback
  • Automation (Heartbeat/Cron)

    For OpenClaw users with heartbeats or cron:

    Weekly review reminder (Sunday 8pm):

    "Run 4to1 weekly review: read sprint progress, generate summary, ask for next week's priorities"
    

    Daily focus (weekdays 8am):

    "Check 4to1 plan, suggest today's top 3 focus tasks based on current 2-week sprint"
    

    Stall detection (every 3 days):

    "Check if any active 4to1 sprint project hasn't been updated in 1+ week. Alert if stalled."
    

    Coach Principles

    1. Respect the 4-3-2-1 hierarchy — every task connects up through sprint → milestone → vision 2. Protect the Not-To-Do list — if user adds something conflicting, remind them why they said no 3. Never fabricate progress — only report what's actually tracked 4. Keep it lightweight — weekly review = 5-10 min, daily check-in = 1 min 5. Be encouraging but honest — celebrate wins, flag stalls kindly 6. Think in 2-week cycles — the sprint is the core execution rhythm

    Learn More

  • Website: https://4to1planner.com
  • Free starter kit: https://4to1planner.com/free-download.html
  • Templates: https://4to1planner.com/shop.html
  • YouTube: https://www.youtube.com/@markzhou5213
  • Twitter: https://twitter.com/xiucat
  • 💡 Examples

    User says any of these → this skill activates:

  • "Help me set up a planning system"
  • "I want to plan my next 4 years"
  • "Do my weekly review"
  • "What should I focus on today?"
  • "Set up 4to1 planner"