Engineering Manager OS
by @1kalin
Complete engineering management system — team building, 1:1s, performance, hiring, architecture decisions, incident management, and scaling. From IC-to-manag...
clawhub install afrexai-engineering-manager📖 About This Skill
name: Engineering Manager OS description: Complete engineering management system — team building, 1:1s, performance, hiring, architecture decisions, incident management, and scaling. From IC-to-manager transition through director-level operations. metadata: {"clawdbot":{"emoji":"⚙️","os":["linux","darwin","win32"]}}
Engineering Manager Operating System
Your complete playbook for engineering leadership. Not generic management advice — this is the specific system that high-performing engineering managers run daily.
Phase 1: Team Architecture
Team Topology Assessment
Before managing people, understand the system they work in.
team_topology:
name: "[Team Name]"
type: stream-aligned | platform | enabling | complicated-subsystem
mission: "[One sentence — what does this team exist to do?]"
boundaries:
owns: ["service-x", "domain-y", "pipeline-z"]
consumes: ["auth-service", "data-platform"]
provides: ["checkout-api", "payment-events"]
cognitive_load: low | medium | high | overloaded
interaction_modes:
- team: "[Other Team]"
mode: collaboration | x-as-a-service | facilitating
friction: low | medium | high
notes: "[What's working/not working]"
current_headcount: N
ideal_headcount: N
skill_gaps: ["observability", "mobile", "ML"]
Team Health Radar (Monthly)
Score 1-5 for each dimension. Track trends over time.
| Dimension | Score | Signal | |-----------|-------|--------| | Delivery pace | _ /5 | Are we shipping what we committed? | | Quality | _ /5 | Bug rate, incident frequency, tech debt trajectory | | Collaboration | _ /5 | Cross-functional work, PR review speed, knowledge sharing | | Morale | _ /5 | Energy in meetings, voluntary contributions, retention signals | | Learning | _ /5 | New skills adopted, conference talks, internal tech talks | | Autonomy | _ /5 | Can the team make decisions without waiting for me? | | Psychological safety | _ /5 | Do people raise concerns, admit mistakes, challenge ideas? | | On-call health | _ /5 | Page frequency, off-hours burden, burnout signals |
Action rules:
Team Composition Model
The ideal team has these roles covered (not necessarily 1:1 with people):
| Role | Description | Gap Impact | |------|-------------|------------| | Tech lead | Architecture decisions, code quality bar | Decisions bottleneck through you | | Senior IC (2-3) | Carry complex work, mentor juniors | Velocity drops, quality suffers | | Mid-level (2-3) | Reliable delivery, growing scope | No bench for senior pipeline | | Junior (0-2) | Learning, fresh perspective | No talent pipeline | | Domain expert | Deep knowledge of the problem space | Constantly solving wrong problems |
Rule of thumb: Never have >60% of team at same level. Mix creates natural mentorship.
Phase 2: 1:1 System
1:1 Cadence
| Report Level | Frequency | Duration | Focus | |-------------|-----------|----------|-------| | Direct reports | Weekly | 30 min | Career + blockers + feedback | | Skip-levels | Monthly | 30 min | Team health + career + honesty check | | Your manager | Weekly | 30 min | Priorities + asks + air cover | | Cross-functional peers | Bi-weekly | 25 min | Dependencies + alignment |
1:1 Template (Direct Reports)
one_on_one:
date: "YYYY-MM-DD"
person: "[Name]"
role: "[Title]"
tenure: "[X months on team]"
# Their agenda first — ALWAYS
their_topics: []
# Check-in (2 min)
energy_level: 1-10 # "How are you feeling about work this week?"
energy_trend: up | stable | down
# Delivery (5 min)
current_work: "[What they're working on]"
blockers: []
help_needed: "[What can I unblock?]"
# Growth (10 min — skip if urgent topics dominate, but never 3 weeks in a row)
career_conversation: "[Topic discussed]"
feedback_given: "[Specific behavior → impact → request]"
feedback_received: "[What they told me]"
stretch_opportunity: "[Current or upcoming]"
# Action items
my_actions: [] # What I committed to do
their_actions: [] # What they committed to do
# Signals (private — don't share these)
flight_risk: low | medium | high
performance_trajectory: improving | stable | declining
notes: "[Anything notable]"
1:1 Question Bank
Opening (rotate these — never use the same opener 3 weeks in a row):
Career development (monthly deep-dive):
Team health (probe with care):
Feedback solicitation (for YOU):
Flight Risk Detection
Monitor these signals — if 3+ present, have a retention conversation within a week:
| Signal | Weight | Detection | |--------|--------|-----------| | LinkedIn profile update | 🔴 High | Someone mentions it, or you notice | | Declining 1:1 engagement | 🔴 High | Shorter answers, less eye contact, "everything's fine" | | Stopped volunteering for projects | 🟡 Medium | Used to raise hand, now doesn't | | Increased PTO without travel | 🟡 Medium | Interviewing signal | | Disengaged in meetings | 🟡 Medium | Camera off, multitasking, no opinions | | Complaining shifted from specific to general | 🟡 Medium | "This sprint is rough" → "This place..." | | Stopped arguing for their ideas | 🔴 High | They've mentally checked out | | Life event (new baby, move, partner change) | 🟡 Medium | Re-evaluating everything |
Retention conversation framework: 1. Name it: "I've noticed [specific behavior change]. I want to check in." 2. Listen: Let them talk. Don't interrupt. Don't get defensive. 3. Understand: "What would make this the best job you've ever had?" 4. Act: Make a concrete commitment within 48 hours — title, comp, scope, flexibility 5. Follow up: Check back in 1 week. Did what you promised make a difference?
Phase 3: Performance Management
Performance Calibration Framework
Rate on two axes (both matter):
Delivery Impact (What) | Level | Description | |-------|-------------| | 1 - Below | Missing commitments, quality issues, needs close oversight | | 2 - Meeting | Delivering assigned work reliably | | 3 - Exceeding | Delivering beyond scope, finding better solutions | | 4 - Outstanding | Multiplying team output, solving problems no one asked them to |
Behaviors (How) | Level | Description | |-------|-------------| | 1 - Below | Creating friction, not collaborating, ignoring feedback | | 2 - Meeting | Professional, collaborative, receptive to feedback | | 3 - Exceeding | Mentoring others, proactively improving processes | | 4 - Outstanding | Shaping culture, attracting talent, raising the entire bar |
Calibration matrix:
| | Behavior 1 | Behavior 2 | Behavior 3 | Behavior 4 | |---|---|---|---|---| | Delivery 4 | Coach behaviors | Strong | Top performer | Superstar | | Delivery 3 | Coach behaviors | Solid | Strong | Top performer | | Delivery 2 | PIP candidate | Meets expectations | Developing | Growing | | Delivery 1 | Exit | PIP | Coach delivery | Coach delivery |
Feedback Framework: SBI-I (Situation-Behavior-Impact-Intent)
Template: "In [situation], when you [specific behavior], the impact was [concrete effect]. I'd like to see [specific change] because [intent/why it matters]."
Examples:
✅ Good: "In yesterday's design review, when you challenged the API schema with the versioning concern, it caught a breaking change we would have shipped. That's exactly the kind of technical leadership I want to see more of."
❌ Bad: "You're doing great work. Keep it up." (Too vague — they learn nothing)
✅ Good: "In the last two sprints, PRs have been sitting in review for 3+ days. The impact is features are merging late and we're missing sprint commitments. I'd like us to commit to <24h first review because velocity depends on review speed."
❌ Bad: "You need to review PRs faster." (No situation, no impact, no collaboration)
Performance Improvement Plan (PIP) Template
pip:
employee: "[Name]"
role: "[Title]"
manager: "[Your name]"
start_date: "YYYY-MM-DD"
end_date: "YYYY-MM-DD" # 30-60 days, never >90
context: |
[Specific pattern of underperformance with dates and examples.
Must reference prior feedback conversations and dates they occurred.]
expectations:
- area: "[Specific skill/behavior]"
current_state: "[What's happening now — with examples]"
target_state: "[What success looks like — measurable]"
measurement: "[How we'll measure — PR metrics, sprint completion, etc.]"
support: "[What I'll provide — pairing, training, reduced scope]"
check_ins:
frequency: weekly
day: "[Day]"
format: "[30 min 1:1 with written summary]"
outcomes:
success: "[What happens if targets met — return to normal performance management]"
failure: "[What happens if targets not met — typically termination]"
# CRITICAL: Have HR review before sharing. Document every check-in.
hr_reviewed: false
hr_reviewer: "[Name]"
PIP rules:
Promotion Case Template
promotion_case:
candidate: "[Name]"
current_level: "[Level]"
target_level: "[Level]"
manager: "[Your name]"
date: "YYYY-MM-DD"
# Already operating at next level (past 6+ months)
evidence:
- dimension: "Technical complexity"
examples:
- "[Specific project/decision with measurable impact]"
- "[Another example]"
- dimension: "Scope & ownership"
examples:
- "[Owned X end-to-end, previously needed guidance]"
- dimension: "Influence & leadership"
examples:
- "[Mentored Y, led Z initiative, shaped team direction]"
- dimension: "Business impact"
examples:
- "[Revenue/efficiency/reliability improvement with numbers]"
peer_feedback:
- from: "[Name, role]"
quote: "[Specific praise with examples]"
# Why now, not 6 months from now?
timing_justification: |
[They've been consistently operating at next level for X months.
Delaying creates retention risk and sends wrong signal to team.]
# What's the gap? (Be honest — calibration committees will find it)
growth_areas: |
[Areas they're still developing. Frame as "growing into" not "lacking."]
Phase 4: Hiring Machine
Hiring Pipeline
Role opened → Job description → Sourcing (5-7 days)
→ Resume screen → Recruiter screen (30 min)
→ Technical phone screen (60 min) → Take-home OR live coding (2-4 hrs)
→ Onsite/virtual loop (3-4 hrs) → Debrief → Offer → CloseTarget: <21 days from first screen to offer
Job Description Template
# [Role Title] — [Team Name]What you'll do
[3-5 bullet points of ACTUAL work, not generic responsibilities]
Ship [specific feature/system] that [specific impact]
Own [specific domain] end-to-end
[Concrete example of a recent problem this person would solve] What you'll need
[Must-haves only — each one must be a genuine filter]
X years building [specific technology/domain]
Experience with [specific technical requirement]
[Skill that actually differentiates candidates] Nice to have (genuinely nice, not secretly required)
[Thing that would accelerate ramp-up]
[Adjacent skill that adds value] What we offer
[Be specific — "competitive salary" means nothing]
Salary range: $X-$Y (based on [location/level])
[Specific benefits that matter to engineers]
[Team/culture thing that's actually true and differentiating] How we hire
[Timeline and what to expect — respect their time]
1. [Step]: [Duration] — [What we're assessing]
2. [Step]: [Duration] — [What we're assessing]
Total time investment: ~X hours
Interview Scorecard (Per Interviewer)
scorecard:
candidate: "[Name]"
interviewer: "[Name]"
interview_type: "technical | system design | behavioral | culture"
date: "YYYY-MM-DD"
# Score each dimension 1-4 (no 3s allowed — forces a decision)
dimensions:
- name: "Technical depth"
score: _ # 1=no hire, 2=lean no, 4=lean yes, 5=strong yes (skip 3)
evidence: "[Specific examples from the interview]"
- name: "Problem solving approach"
score: _
evidence: "[How they broke down the problem, handled hints]"
- name: "Communication clarity"
score: _
evidence: "[Could they explain their thinking? Did they ask good questions?]"
- name: "Collaboration signals"
score: _
evidence: "[How did they respond to pushback? Did they build on ideas?]"
# Overall
hire_recommendation: strong_no | no | yes | strong_yes
level_recommendation: "[What level would you place them?]"
concerns: "[Anything that gave you pause]"
highlights: "[What impressed you most]"
Debrief Protocol
1. No pre-discussion — Submit scorecards BEFORE the debrief meeting 2. Hire bar holder speaks last — Prevent anchoring 3. Discuss each dimension, not overall vibes — "Tell me about their system design approach" not "What did you think?" 4. Any strong_no is a veto — Unless the interviewer can be convinced their signal was a misread 5. Decide in the room — Don't "sleep on it" unless genuinely torn (then it's probably a no) 6. Leveling before offer — Agree on level first, then comp follows from band
Closing Candidates
The 3 things that close engineers: 1. The problem — "Here's the specific hard problem you'd work on" 2. The people — Connect them with future teammates before offer 3. The growth — "Here's where this role leads in 18 months"
Offer call structure (15-20 min): 1. Express genuine excitement (2 min) 2. Present offer details — base, equity, bonus, start date (3 min) 3. Explain equity/comp philosophy (3 min) 4. Ask: "How does this compare to what you were expecting?" (listen) 5. Address concerns immediately if possible 6. Set a decision deadline (3-5 business days, not open-ended) 7. Ask: "Is there anything that would make this a clear yes?"
Phase 5: Technical Leadership
Architecture Decision Record (ADR)
adr:
id: "ADR-NNN"
title: "[Decision title]"
date: "YYYY-MM-DD"
status: proposed | accepted | deprecated | superseded
superseded_by: "ADR-NNN" # if applicable
context: |
[What situation are we in? What forces are at play?
Include constraints: timeline, team skill, budget, scale requirements.]
options:
- name: "[Option A]"
pros: ["pro 1", "pro 2"]
cons: ["con 1", "con 2"]
effort: "[T-shirt size]"
risk: low | medium | high
- name: "[Option B]"
pros: ["pro 1"]
cons: ["con 1", "con 2", "con 3"]
effort: "[T-shirt size]"
risk: low | medium | high
decision: |
[What we decided and WHY. The "why" is the most important part.
Future readers need to understand the reasoning, not just the choice.]
consequences: |
[What follows from this decision? What becomes easier/harder?
What do we need to monitor?]
review_date: "YYYY-MM-DD" # When to revisit this decision
Tech Debt Prioritization
Score each debt item on two axes:
Impact of fixing (1-5):
Cost of NOT fixing (1-5):
Priority = Impact × Cost-of-not-fixing
| Score | Action | |-------|--------| | 20-25 | Fix THIS sprint — it's an emergency | | 12-19 | Schedule within 2 sprints | | 6-11 | Add to quarterly tech debt budget (allocate 15-20% of sprint capacity) | | 1-5 | Backlog — revisit quarterly |
Code Review Culture Guidelines
code_review_standards:
sla:
first_review: "< 4 hours during work hours"
follow_up: "< 2 hours"
max_pr_size: 400 # lines changed — larger needs pre-review or splitting
what_to_review:
always:
- "Correctness — does it do what it claims?"
- "Edge cases — what happens with nil/empty/max/concurrent?"
- "Security — auth checks, input validation, secrets exposure"
- "Naming — will someone understand this in 6 months?"
sometimes:
- "Performance — only if in hot path or O(n²)+ risk"
- "Style — only if it significantly hurts readability"
never:
- "Personal preference disguised as improvement"
- "Premature optimization suggestions"
- "Rewriting working code to your style"
tone_rules:
- "Ask questions instead of making demands: 'What happens if X is nil?' not 'Handle the nil case'"
- "Prefix opinion with 'nit:' or 'optional:' — make severity clear"
- "Praise good code — 'Nice abstraction here' costs nothing"
- "If >5 comments, offer to pair instead"
- "Approve with comments when nothing is blocking — trust your team"
Phase 6: Sprint & Delivery
Sprint Ceremony Cheat Sheet
| Ceremony | Duration | Who | Purpose | Your Role | |----------|----------|-----|---------|-----------| | Sprint planning | 1-2 hrs | Team + PO | Commit to sprint goal | Facilitate, challenge estimates, protect capacity | | Daily standup | 15 min | Team | Surface blockers | Listen for problems, DON'T manage tasks | | Backlog refinement | 1 hr | Team + PO | Prepare future work | Ensure technical feasibility, flag risks | | Sprint review | 30 min | Team + stakeholders | Demo working software | Let the team present, handle stakeholder Qs | | Retrospective | 1 hr | Team only | Improve process | Facilitate, ensure psychological safety, track actions |
Sprint Health Metrics
Track these weekly — trend matters more than absolute numbers:
| Metric | Healthy Range | Red Flag | |--------|---------------|----------| | Sprint completion rate | 80-100% of committed points | <70% for 2+ sprints | | Carry-over stories | 0-1 per sprint | Same story carried 3+ sprints | | PR cycle time | <48 hours open to merge | >72 hours consistently | | Bug escape rate | <10% of stories create bugs | Rising trend | | Deployment frequency | Daily to weekly | Monthly or less | | Sprint goal achievement | Yes/No binary | No for 3+ consecutive sprints |
Estimation Heuristic
When the team struggles with estimation:
| Certainty Level | Approach | |----------------|----------| | "We've done this exact thing before" | Size by comparison to past work | | "We understand the problem but not the solution" | Spike first (timeboxed), then estimate | | "We don't fully understand the problem" | Discovery task (1-2 days), then re-scope | | "We have no idea" | Break it down until you reach pieces you can estimate |
Rule: If an estimate is >8 points (or >5 days), it's not estimated — it's a guess. Break it down further.
Phase 7: Incident Management
Incident Response Framework
incident:
id: "INC-YYYY-NNN"
severity: SEV1 | SEV2 | SEV3 | SEV4
detected: "YYYY-MM-DD HH:MM UTC"
resolved: "YYYY-MM-DD HH:MM UTC"
duration: "Xh Ym"
commander: "[Name]"
# Severity guide
# SEV1: Revenue impact, data loss, full outage — ALL HANDS, exec notification
# SEV2: Degraded service, partial outage — On-call + team lead
# SEV3: Minor degradation, workaround exists — On-call handles
# SEV4: Cosmetic, no user impact — Normal ticket
timeline:
- time: "HH:MM"
action: "[What happened / what was done]"
who: "[Name]"
root_cause: |
[Technical root cause — be specific.
"Human error" is never the root cause. What system allowed the error?]
contributing_factors:
- "[Factor 1 — e.g., missing monitoring on X]"
- "[Factor 2 — e.g., deployment during peak without feature flag]"
action_items:
- description: "[Specific fix]"
owner: "[Name]"
due_date: "YYYY-MM-DD"
priority: P0 | P1 | P2
status: open | in_progress | done
Blameless Post-Mortem Template
Facilitation rules: 1. Focus on systems, not individuals 2. "What" and "how," never "who" 3. Everyone involved attends (including on-call who was paged) 4. Schedule within 48 hours of resolution (memories fade) 5. Write it up and share publicly within the engineering org
Structure (60-90 min): 1. Timeline review (20 min) — Walk through chronologically. Fill gaps. 2. Root cause analysis (15 min) — "5 Whys" until you hit a systemic issue 3. What went well (10 min) — Reinforce good incident response behaviors 4. What went wrong (15 min) — Process failures, detection gaps, communication issues 5. Action items (15 min) — Each must have an owner and due date. Max 5 items — focus beats volume.
On-Call Health Guidelines
| Metric | Healthy | Unhealthy | |--------|---------|-----------| | Pages per week | <5 | >10 | | Off-hours pages | <2/week | >5/week | | Time to acknowledge | <5 min | >15 min | | False positive rate | <20% | >50% | | Rotation size | 4+ people | <3 people | | Consecutive weeks on-call | Never >2 | Regular 3+ week stretches |
If on-call is unhealthy: This is a tech debt problem, not a people problem. Invest in reliability before adding headcount.
Phase 8: Scaling & Org Design
When to Split a Team
| Signal | Action | |--------|--------| | Team >8 people | Split before communication overhead kills velocity | | Two distinct domains in one team | Split along domain boundaries | | Standup takes >15 min | Too many threads — people are tuning out | | PR review queue >48 hours consistently | Not enough context overlap — specialize | | On-call covers too many services | Reduce blast radius per team |
Splitting Protocol
1. Define boundaries clearly — What does each new team OWN? Write it down. 2. Split the backlog — Every ticket gets a home. Shared backlogs = shared ownership = no ownership. 3. Split on-call — Each team owns their services' reliability. 4. Name the teams — Sounds trivial, matters for identity. 5. Designate tech leads — Don't leave both teams looking to you for technical decisions. 6. Give it 3 months — Resist re-orging again too quickly. Turbulence is normal.
Manager-to-IC Ratio
| Team Size | Structure | |-----------|-----------| | 3-5 ICs | Player-coach (you're still coding ~30-40%) | | 5-8 ICs | Full-time manager (stop coding in critical path) | | 8-12 ICs | Split the team OR add a tech lead as force multiplier | | 12+ ICs | Must split — you cannot manage this effectively |
The IC-to-Manager Transition
If you're newly managing (or coaching someone through it):
Stop doing:
Start doing:
Keep doing:
Timeline to competence:
Phase 9: Communication & Stakeholder Management
Weekly Status Update Template
Send this to your manager and stakeholders every Friday:
# [Team Name] — Week of [Date]🎯 Sprint Goal: [Goal] — On Track / At Risk / Off Track
✅ Shipped This Week
[Feature/fix] — [Impact in user/business terms]
[Feature/fix] — [Impact] 🔨 In Progress
[Work item] — [Status, ETA, any blockers] 🚨 Risks & Blockers
[Risk] — [What you're doing about it, what you need] 📊 Key Metrics
Deploy frequency: X
Incident count: X (SEV breakdown)
Sprint completion: X% 🔮 Next Week
[Priority 1]
[Priority 2]
Managing Up Checklist
| Do | Don't | |----|-------| | Bring solutions with problems | Dump problems without proposals | | Flag risks early with mitigation plans | Surprise with bad news at the last minute | | Quantify impact (hours, $$, users) | Use vague language ("it's kinda slow") | | Say "I need X from you by Y" | Hope they'll figure out you need help | | Send written updates proactively | Wait to be asked for status | | Disagree in private | Disagree in public meetings | | Ask for feedback regularly | Assume no news is good news |
Cross-Functional Relationship Map
stakeholders:
- name: "[Product Manager]"
relationship: partner
cadence: "Daily async + weekly 1:1"
currency: "Scope clarity, user data, priority decisions"
- name: "[Design Lead]"
relationship: partner
cadence: "Bi-weekly sync + ad-hoc"
currency: "Early technical feasibility input"
- name: "[Platform/Infra Team]"
relationship: dependency
cadence: "Monthly sync + Slack"
currency: "Clear requirements, advance notice of needs"
- name: "[Your Manager]"
relationship: air_cover
cadence: "Weekly 1:1"
currency: "No surprises, clear asks, good judgment"
Phase 10: Engineering Manager Rituals
Daily (15 min total)
Weekly
Monthly
Quarterly
Phase 11: Difficult Situations Playbook
Scenario: Two Senior Engineers Disagree on Architecture
1. Let them present both approaches in a design doc (each writes their own section) 2. Define decision criteria BEFORE evaluating: reversibility, maintenance cost, team familiarity, timeline 3. Facilitate a time-boxed discussion (60 min max) 4. If no consensus: the tech lead or DRI decides. Not you (unless you must). 5. Document the decision as an ADR — the "why" matters more than the "what" 6. The person who "lost" must commit fully. Monitor for passive resistance.
Scenario: High Performer Wants to Be a Manager
1. Explore motivation: "Tell me what you think a manager does day-to-day" 2. Test with real work: lead a project, mentor a junior, run a retrospective 3. Be honest about tradeoffs: less coding, more meetings, slower feedback loops, ambiguous success metrics 4. Offer the Staff/Principal IC path as a genuine alternative, not a consolation prize 5. If they proceed: set explicit check-in at 3 months — "Is this what you wanted?"
Scenario: You Inherit a Low-Performing Team
1. Week 1-2: Listen. 1:1 with every person. Don't change anything yet. 2. Week 3-4: Identify the 1-2 systemic issues (usually: unclear priorities, no accountability, or trust deficit) 3. Month 2: Make ONE process change. Get a quick win. Build credibility. 4. Month 3: Address performance issues you've now observed firsthand 5. Never: Blame the previous manager publicly. Never say "things are going to change around here."
Scenario: Layoffs / Reorg Affecting Your Team
1. Before announcement: Prepare a plan for remaining team — who covers what? 2. During: Be honest about what you know and what you don't. "I don't know" > corporate-speak. 3. After: 1:1 with every remaining person within 48 hours. Expect anger, fear, guilt. 4. Ongoing: Workload audit — don't expect same output from fewer people. Push back on scope. 5. Self-care: This is one of the hardest parts of the job. Talk to your own manager or a coach.
Scenario: Your Best Engineer Gives Notice
1. Same day: Have a real conversation. Not a counteroffer — understand why. 2. If it's about money: Match or beat if they're worth it. If your company won't, that tells you something. 3. If it's about growth/role: Can you create what they want? Be honest if you can't. 4. If they're leaving for the right reasons: Celebrate them. Write a recommendation. Don't make it weird. 5. Immediately: Start knowledge transfer plan. Identify what only they know. 6. To the team: Transparent but positive. "X is leaving for a great opportunity. Here's our transition plan."
Scoring Rubric: Engineering Manager Effectiveness (0-100)
| Dimension | Weight | Indicators | |-----------|--------|------------| | Team health | 20% | Retention, engagement scores, psychological safety signals | | Delivery | 20% | Sprint completion, quality metrics, stakeholder satisfaction | | People development | 20% | Promotions, skill growth, 1:1 quality, mentorship | | Technical stewardship | 15% | Tech debt trajectory, architecture quality, incident trends | | Hiring | 10% | Pipeline health, offer acceptance rate, new hire ramp time | | Communication | 10% | Stakeholder relationships, information flow, no surprises | | Self-improvement | 5% | Seeking feedback, adapting, growing as a leader |
Scoring: