蒋道理|撤三证据链与风险审核引擎(SJ-IRAC)
by @jisngzhongling
CNIPA撤三(连续三年不使用)双轨证据引擎:答辩证据链构建 + 质证审计(SJ-6 + IRAC + 风险A–E)。
clawhub install jiang-irac-nonuse-evidence📖 About This Skill
name: jiang-nonuse slug: jiang-irac-nonuse-evidence display_name: 蒋道理|撤三证据链与风险审核引擎(SJ-IRAC) version: 3.0.1 description: CNIPA撤三(连续三年不使用)双轨证据引擎:答辩证据链构建 + 质证审计(SJ-6 + IRAC + 风险A–E)。 homepage: https://github.com/jiangzhongling/jiang-nonuse metadata: clawdbot: emoji: "🧾" tags: - trademark - cnipa - nonuse - evidence - sj-irac - cancellation - legal-ai
SJ-IRAC Non-Use Engine(撤三证据推理系统)
Professional Release v2.0.1 Author: Jiang Zhongling(商标蒋道理) Organization: Nantong Zhongnan Quansheng IP Co., Ltd. Last Updated: 2026-02-04
1. System Positioning
SJ-IRAC Non-Use Engine is a professional-grade evidence reasoning and document production system for CNIPA 3-year non-use cancellation proceedings.
This system is designed to produce examiner-oriented, period-centered, legally structured defense and cross-examination outputs.
Core Objective:
Transform scattered evidence into a continuous, verifiable, legally sufficient use chain.
2. Problems Addressed
This system focuses on eliminating decisive failure causes in non-use cases:
3. System Architecture
Core Principle:Period → Evidence → Elements → Logic → Risk → Decision → Document
4. Legal & Evidence Constitution
4.1 Applicable Law
Trademark use must satisfy:
4.2 No-Fabrication Rule
Prohibited:
Each exhibit must show:
Source / Date / Carrier / Proof Purpose
4.3 SJ-6 Evidence Chain
All exhibits are evaluated by:
1. Authenticity 2. Relevance 3. Completeness 4. Temporal Validity 5. Logical Consistency 6. Resistance
Non-qualified items are excluded.
4.4 Core Proof Targets (T1–T6)
| Code | Target | |------|--------| | T1 | User identity | | T2 | Mark form | | T3 | Goods/services | | T4 | Time / Period | | T5 | Commercial context | | T6 | Transaction loop |
Missing targets → mandatory risk escalation.
4.5 Designated Period Control Rule(指定期间控制规则)
All defense outputs must demonstrate continuous commercial use within the designated three-year period.
Mandatory segmentation:
P1: First 12 months P2: Middle 12 months P3: Last 12 months
Rules:
Zero-gap continuity is the primary examination anchor.
4.6 Period–Element Binding Rule
Each exhibit must be mapped as:
Date → Period Segment → T4 → Goods → Mark → Transaction
Unmapped evidence = invalid.
5. Workflow Architecture (SJ-REVOKE OS)
Phase 0 — Admission
Feasibility + Cost + Period RiskPhase 1 — Inventory
Registration + Period Segmentation + SJ-6Phase 2 — Chaining
Period → Transaction → Mark → GoodsPhase 3 — Risk Audit
Period / Subject / Mapping / AuthenticityPhase 4 — Strategy
Reinforce / Supplement / Stop-lossPhase 5 — Drafting
Period-driven automationPhase 6 — QC
Continuity + ReadabilityPhase 7 — Archive
Review + ReuseNo skipping permitted.
6. Risk & Stop-Loss Engine
6.1 Risk Levels
| Level | Meaning | |-------|---------| | A | Full period coverage + strong loop | | B | Minor gaps, repairable | | C | Partial period missing | | D | Structural weakness | | E | Fatal discontinuity |
6.2 Kill Gates
6.3 Output
Each case outputs:
Decision + Level + Period Map + Risk Points + Actions
7. Dual-Track System
7.1 Defensive Track(被申请人端)
Goal:
Period continuity + Closed commercial loop
Minimum Chain:
Mark + Goods + Period + Transaction
7.2 Offensive Track(申请人端)
Focus:
Break period continuity and element linkage
Priority:
Time → Subject → Goods → Loop → Authenticity
8. Evidence Index Standard (SJ-6 Mandatory)
8.1 Binding Rule
All submissions must include a Period-Mapped SJ-6 Index.
8.2 Mandatory Fields
1. ID 2. Name 3. Source 4. Date 5. Period Segment 6. Goods 7. Target 8. SJ-6 9. Pages 10. Risk
8.3 Template
| ID | Name | Date | Period | Goods | Target | SJ6 | Pages | Risk | |----|------|------|--------|-------|--------|-----|-------|------|
8.4 Grouping
All mandatory.
9. Standard Deliverables
| Item | Must Include | |------|--------------| | Period Matrix | Yes | | Timeline | Yes | | Risk Map | Yes | | IRAC | Yes | | Draft | Yes |
No partial submission.
10. Input & Invocation
10.1 Inputs
Missing period info → reject.
10.2 Modes
11. Non-Suitable Cases
→ Mandatory stop-loss.
12. Version Governance
12.1 Format
Major.Minor.Patch
12.2 Principles
12.3 Change Log
v2.0.0
13. Professional Ethics
No manipulation.
14. Cross-Examination Argument Library(质证模型)
All offensive outputs must reference this library and period defects.
(以下内容保持原版,略)
15. Respondent Defense & Self-Audit Model(答辩+自查)
15.1 Pre-Defense Self-Audit
Any missing segment → Stop-loss review.
15.2 Defense Workflow
1. Build Period Chain 2. Repair Weak Segments 3. Rank Evidence 4. Risk Label 5. IRAC Draft
15.3 Defense Output
16. Applicant Cross-Examination Model(申请人质证)
16.1 Deconstruction
16.2 Strategy Matrix
| Defect | Priority | Tool | |--------|----------|------| | Period | Highest | C | | Authenticity | High | A | | Relevance | High | B | | Loop | Medium | D | | Logic | Medium | E |
16.3 Challenge Output
End of Document