🎁 Get the FREE AI Skills Starter GuideSubscribe →
BytesAgainBytesAgain
🦀 ClawHub

蒋道理|撤三证据链与风险审核引擎(SJ-IRAC)

by @jisngzhongling

CNIPA撤三(连续三年不使用)双轨证据引擎:答辩证据链构建 + 质证审计(SJ-6 + IRAC + 风险A–E)。

Versionv3.0.1
Downloads2,516
Comments1
TERMINAL
clawhub install jiang-irac-nonuse-evidence

📖 About This Skill

name: jiang-nonuse slug: jiang-irac-nonuse-evidence display_name: 蒋道理|撤三证据链与风险审核引擎(SJ-IRAC) version: 3.0.1 description: CNIPA撤三(连续三年不使用)双轨证据引擎:答辩证据链构建 + 质证审计(SJ-6 + IRAC + 风险A–E)。 homepage: https://github.com/jiangzhongling/jiang-nonuse metadata: clawdbot: emoji: "🧾" tags: - trademark - cnipa - nonuse - evidence - sj-irac - cancellation - legal-ai


SJ-IRAC Non-Use Engine(撤三证据推理系统)

Professional Release v2.0.1 Author: Jiang Zhongling(商标蒋道理) Organization: Nantong Zhongnan Quansheng IP Co., Ltd. Last Updated: 2026-02-04


1. System Positioning

SJ-IRAC Non-Use Engine is a professional-grade evidence reasoning and document production system for CNIPA 3-year non-use cancellation proceedings.

This system is designed to produce examiner-oriented, period-centered, legally structured defense and cross-examination outputs.

Core Objective:

Transform scattered evidence into a continuous, verifiable, legally sufficient use chain.


2. Problems Addressed

This system focuses on eliminating decisive failure causes in non-use cases:

  • Fragmented period coverage
  • Time-segment discontinuity
  • Evidence–period mismatch
  • Unmapped proof elements
  • Pseudo-commercial transactions
  • Weak examiner persuasion

  • 3. System Architecture

    Core Principle:

    Period → Evidence → Elements → Logic → Risk → Decision → Document


    4. Legal & Evidence Constitution

    4.1 Applicable Law

  • PRC Trademark Law (2019)
  • Implementing Regulations
  • CNIPA Guidelines
  • Nice Classification
  • Trademark use must satisfy:

  • Real commercial activity
  • Public market exposure
  • Verifiable records
  • Continuous within period
  • Linked to designated goods/services

  • 4.2 No-Fabrication Rule

    Prohibited:

  • Invented transactions
  • Fabricated invoices/contracts
  • Backdated materials
  • Editable screenshots
  • Narrative-only statements
  • Each exhibit must show:

    Source / Date / Carrier / Proof Purpose


    4.3 SJ-6 Evidence Chain

    All exhibits are evaluated by:

    1. Authenticity 2. Relevance 3. Completeness 4. Temporal Validity 5. Logical Consistency 6. Resistance

    Non-qualified items are excluded.


    4.4 Core Proof Targets (T1–T6)

    | Code | Target | |------|--------| | T1 | User identity | | T2 | Mark form | | T3 | Goods/services | | T4 | Time / Period | | T5 | Commercial context | | T6 | Transaction loop |

    Missing targets → mandatory risk escalation.


    4.5 Designated Period Control Rule(指定期间控制规则)

    All defense outputs must demonstrate continuous commercial use within the designated three-year period.

    Mandatory segmentation:

    P1: First 12 months P2: Middle 12 months P3: Last 12 months

    Rules:

  • Each segment must contain ≥1 valid commercial-use proof
  • Any empty segment triggers G1 escalation
  • Two or more empty segments → fatal defect
  • Zero-gap continuity is the primary examination anchor.


    4.6 Period–Element Binding Rule

    Each exhibit must be mapped as:

    Date → Period Segment → T4 → Goods → Mark → Transaction

    Unmapped evidence = invalid.


    5. Workflow Architecture (SJ-REVOKE OS)

    Phase 0 — Admission

    Feasibility + Cost + Period Risk

    Phase 1 — Inventory

    Registration + Period Segmentation + SJ-6

    Phase 2 — Chaining

    Period → Transaction → Mark → Goods

    Phase 3 — Risk Audit

    Period / Subject / Mapping / Authenticity

    Phase 4 — Strategy

    Reinforce / Supplement / Stop-loss

    Phase 5 — Drafting

    Period-driven automation

    Phase 6 — QC

    Continuity + Readability

    Phase 7 — Archive

    Review + Reuse

    No skipping permitted.


    6. Risk & Stop-Loss Engine

    6.1 Risk Levels

    | Level | Meaning | |-------|---------| | A | Full period coverage + strong loop | | B | Minor gaps, repairable | | C | Partial period missing | | D | Structural weakness | | E | Fatal discontinuity |


    6.2 Kill Gates

  • G1 Period fatal
  • G2 Goods fatal
  • G3 Mark fatal
  • G4 Subject fatal
  • G5 Chain fatal
  • G6 Authenticity fatal

  • 6.3 Output

    Each case outputs:

    Decision + Level + Period Map + Risk Points + Actions


    7. Dual-Track System

    7.1 Defensive Track(被申请人端)

    Goal:

    Period continuity + Closed commercial loop

    Minimum Chain:

    Mark + Goods + Period + Transaction


    7.2 Offensive Track(申请人端)

    Focus:

    Break period continuity and element linkage

    Priority:

    Time → Subject → Goods → Loop → Authenticity


    8. Evidence Index Standard (SJ-6 Mandatory)

    8.1 Binding Rule

    All submissions must include a Period-Mapped SJ-6 Index.


    8.2 Mandatory Fields

    1. ID 2. Name 3. Source 4. Date 5. Period Segment 6. Goods 7. Target 8. SJ-6 9. Pages 10. Risk


    8.3 Template

    | ID | Name | Date | Period | Goods | Target | SJ6 | Pages | Risk | |----|------|------|--------|-------|--------|-----|-------|------|


    8.4 Grouping

  • P1 Evidence
  • P2 Evidence
  • P3 Evidence
  • All mandatory.


    9. Standard Deliverables

    | Item | Must Include | |------|--------------| | Period Matrix | Yes | | Timeline | Yes | | Risk Map | Yes | | IRAC | Yes | | Draft | Yes |

    No partial submission.


    10. Input & Invocation

    10.1 Inputs

  • Reg No
  • Class
  • Goods
  • Period
  • Evidence
  • Opponent (opt)
  • Missing period info → reject.


    10.2 Modes

  • build (defense)
  • audit (attack)

  • 11. Non-Suitable Cases

  • Period blank ≥2 segments
  • No objective proof
  • Dormant entities
  • Proven fraud
  • Cost overflow
  • → Mandatory stop-loss.


    12. Version Governance

    12.1 Format

    Major.Minor.Patch

    12.2 Principles

  • Period first
  • Evidence first
  • Examiner logic first
  • No speculation

  • 12.3 Change Log

    v2.0.0

  • Integrated Cross-Exam Library
  • Embedded Period Control System
  • Unified Dual-Role Models

  • 13. Professional Ethics

  • Evidence supremacy
  • Full risk disclosure
  • Cost discipline
  • Examiner respect
  • No manipulation.


    14. Cross-Examination Argument Library(质证模型)

    All offensive outputs must reference this library and period defects.

    (以下内容保持原版,略)


    15. Respondent Defense & Self-Audit Model(答辩+自查)

    15.1 Pre-Defense Self-Audit

  • Period Coverage Test (P1–P3)
  • Kill-Gate Test
  • T1–T6 Mapping
  • SJ-6 Scorecard
  • Any missing segment → Stop-loss review.


    15.2 Defense Workflow

    1. Build Period Chain 2. Repair Weak Segments 3. Rank Evidence 4. Risk Label 5. IRAC Draft


    15.3 Defense Output

  • Period-Based Opinion
  • Evidence Index
  • Risk Sheet
  • Supplement Plan

  • 16. Applicant Cross-Examination Model(申请人质证)

    16.1 Deconstruction

  • Period gaps
  • Mapping failure
  • Loop rupture
  • Subject defects

  • 16.2 Strategy Matrix

    | Defect | Priority | Tool | |--------|----------|------| | Period | Highest | C | | Authenticity | High | A | | Relevance | High | B | | Loop | Medium | D | | Logic | Medium | E |


    16.3 Challenge Output

  • Period Defect Table
  • Cross-Opinion
  • Question List
  • Rebuttal Plan

  • End of Document