Structured spec-first development workflow with multi-role expert review gates: clarify requirements, author spec documents (requirements/design/tasks), gene...
clawhub install spec-coderπ About This Skill
name: spec-coder description: >- Structured spec-first development workflow with multi-role expert review gates: clarify requirements, author spec documents (requirements/design/tasks), generate code from spec, verify with real tests, and iterate while keeping spec and code in sync. Use when user wants to build a feature or system with a spec-first approach, mentions "spec coding", "spec-driven development", or asks to write specs before coding.
Spec Coding Workflow
Write specs first, then generate code. 5 phases, each producing artifacts that feed the next. Expert review gates between phases catch issues early.
Session Start
On every new session:
1. Read specs/status.md to identify current phase, active changes, and deferred items.
2. Read phase-relevant spec files β see Quick Reference table below for which artifacts each phase produces/consumes. Skip specs/changes/archive/ β archived changes represent completed/merged work and must not be read or referenced.
3. Confirm with the user which phase/gate to continue from. If mid-phase, summarize progress so far.
4. No specs/status.md? This is a new project β start from Phase 0 (existing codebase) or Phase 1 (greenfield).
Workflow Overview
Phase 0 βββ Phase 1 βββ βGate 1β βββ Phase 2a βββ Phase 2b βββ βGate 2β
(scan) (clarify) (req.) (design) (preview) (design)
β
ββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββββ
βΌ
Phase 2c βββ Phase 2d βββ βGate 3β βββ Phase 3 βββ βGate 4β βββ Phase 4 βββ Phase 5
(tasks) (specs) (plan) (code) (code) (verify) (iterate)
β
βββββββββββββββ
βΌ
Re-trigger Gate
2 / 3 / 4 based
on change scope
Gates auto-approve when no Critical/Major issues. See Expert Review Protocol for details.
Quick Reference
| Phase | Input | Output | Gate | Next |
|-------|-------|--------|------|------|
| 0. Codebase Scan | codebase files | status.md Β§ Codebase Context | β | Phase 1 |
| 1. Clarify & Scope | user requirements + Phase 0 context | requirements.md | Gate 1 (req.) | Phase 2a |
| 2a. Technical Design | requirements.md | design.md | β | Phase 2b |
| 2b. Design Preview | design.md | design-preview/ | Gate 2 (design) | Phase 2c |
| 2c. Task Breakdown | design.md + requirements.md | tasks.md | β | Phase 2d |
| 2d. Feature Specs | tasks.md + design.md | spec_xxx.md | Gate 3 (plan) | Phase 3 |
| 3. Generate | tasks.md + spec_xxx.md | code + tests | Gate 4 (code) | Phase 4 |
| 4. Verify | code + tests + spec_xxx.md | test results, Implementation Map | β | Phase 5 or done |
| 5. Evolve | trunk specs + user request | changes/ | scoped gate | β Phase 1β4 |
When to Use
Trigger conditions:
When NOT to use: Pure bug fixes, one-line config changes, dependency updates, or tasks completable in < 15 minutes without design decisions.
Complexity triage β choose the right track:
| Track | When | Phases | Artifacts | Review Depth |
|-------|------|--------|-----------|-------------|
| Small | Single endpoint, field addition, < 1 hr | Spec (lite) β Generate β Verify | spec_xxx.md only | Lite (1β2 roles, skip if trivial) |
| Medium | Single feature, 1β4 hrs, 1β3 modules | Clarify (brief) β Spec β Generate β Verify | spec_xxx.md + tasks.md | Standard (2β3 roles) |
| Large | Multi-module, > 4 hrs, or new system | Full 5-phase workflow | All spec files | Full (all roles) |
Ask the user which track fits, or infer from the scope of their request.
Small track shortcut:
Skip Phase 1. Write a single spec_xxx.md (Interface + Business Rules + Test Points only), then go straight to Generate β Verify.
Medium track shortcut:
Phase 1 is a brief bullet-point confirmation (no full requirements.md). Phase 2 produces tasks.md + spec_xxx.md only (skip design.md and design-preview/ unless architecture decisions are needed).
Mid-project entry: If the user already has spec files or an existing codebase, read them first. Validate existing artifacts against the expected format, then confirm which phase to start from.
File Organization
Two-layer structure: trunk (current system truth) + changes (incremental work).
specs/
βββ index.md β navigation hub: all features & recent changes
βββ requirements.md β project-level requirements (grows incrementally)
βββ design.md β system-level architecture (grows incrementally)
βββ design-preview/
βββ tasks.md β active tasks only
βββ status.md
βββ spec_.md β feature specs (current truth, one per feature)
βββ changes/ β all incremental work
βββ FEAT-NNN-name/ β new feature (full spec lifecycle)
β βββ spec.md
β βββ design.md
β βββ tasks.md
β βββ delta.md β merge instructions for trunk
βββ CHG-NNN-name/ β change/enhancement (delta only)
β βββ spec.md β ADDED / MODIFIED / REMOVED sections
β βββ tasks.md
β βββ delta.md
βββ archive/ β completed & merged changes
First-time projects: Start with trunk only (no changes/ needed). The changes layer is introduced when the first post-v1 feature or modification begins.
For full lifecycle management details, see Spec Lifecycle Management.
Phase 0 (Optional): Codebase Scan
For existing codebases, run before Phase 1: read dependency files to detect tech stack, list directory tree, identify existing interfaces/models/conventions, and summarize findings.
Output: Write results to specs/status.md under ## Codebase Context (tech stack, key conventions, existing interfaces, directory structure summary). This persists the scan across sessions. Phase 1 references this for requirements scoping; Phase 2a references it for architecture decisions.
Phase 1: Clarify & Scope
Goal: Turn informal requirements into a confirmed, structured requirements.md.
Constraints: Do NOT write any code. Only ask questions and produce documents.
1. Interactive Clarification β Ask user for raw requirements. Summarize goals (3β5 bullets), list ambiguities with options, suggest unconsidered constraints. Iterate until confirmed.
2. Structured Requirements β Produce specs/requirements.md (see template): Background & Objectives, User Roles & Use Cases, Functional Requirements (FR-001...), Non-Functional Requirements, Out of Scope. If Phase 0 ran, populate the "Existing Architecture" section with requirement-relevant context from status.md Β§ Codebase Context.
β Gate 1: Requirements Review
Per Expert Review Protocol β Gate 1. Exit: User approves (or auto-approved).
Phase 2: Spec
Goal: Produce spec documents that directly drive code generation.
2a: Technical Design β specs/design.md
Based on requirements.md, produce specs/design.md (see template):
1. Architecture overview (tech stack, layers, services)
2. Core module breakdown with responsibilities and dependency directions
3. Key data models, interfaces & interaction flows
4. Cross-cutting concerns (error handling, auth, observability, deployment) β skip on Small track
5. NFR fulfillment matrix + key architecture decisions (ADR format) β skip on Small/Medium track
For existing codebases: populate "Existing Architecture" section with architecture-relevant context from status.md Β§ Codebase Context (what's new vs. modified).
2b: Design Preview β specs/design-preview/
Self-contained HTML prototype visualizing architecture, module layout, UI screens or API flows, and data models.
Constraints:
UI projects: All generated UI must follow the UI Design Guidelines to avoid AI-template aesthetics.
β Gate 2: Design Review (2a + 2b combined)
Per Expert Review Protocol β Gate 2. Exit: User approves (or auto-approved).
2c: Task Breakdown β specs/tasks.md
Task table (see template). Target granularity: 30β90 min per task.
2d: Feature Spec β specs/spec_.md
Per feature (see template): Feature Description & Use Cases, Interface Definition, Data Model, Business Rules & Edge Cases, Test Points (β₯ 5 per feature, complex: 10β20; categories: Normal / Error / Boundary / Combination).
β Gate 3: Implementation Plan Review (2c + 2d combined)
Per Expert Review Protocol β Gate 3. Exit: User approves (or auto-approved).
Spec Quality Checklist
Before leaving Phase 2: every interface has explicit I/O types; every business rule has β₯ 1 test point; specs describe what not how; each spec is self-contained for code generation; edge cases are explicit, not implied.
Phase 3: Generate
Goal: Produce implementation code + tests strictly based on the spec.
Spec adherence β tiered rules:
| Tier | Scope | Rule |
|------|-------|------|
| Strict | Interfaces, data models, business rules | Follow spec exactly. Do not change signatures, field names, or behavior. |
| Flexible | Internal implementation (function names, code organization, logging, error messages) | AI decides, but must note deviations in Human-review points. |
| SPEC-GAP | Scenarios the spec doesn't cover (discovered during coding) | Implement a reasonable solution, tag it [SPEC-GAP], and continue. Collect all gaps for batch review in Phase 4. |
Never silently deviate from Strict-tier items. If a Strict item is wrong or incomplete, flag it and ask the user β but do not block on every minor gap.
Execution Strategy
1. Order: Sort tasks by dependency graph (topological order). Infrastructure/setup tasks first.
2. Parallelism: Tasks with no mutual dependencies may be executed in parallel (e.g., via subagents). Tasks sharing the same module should be sequential to avoid merge conflicts.
3. Commit cadence: One commit per task, tagged with task ID: feat(TASK-001): ...
4. Failure handling: If a task fails to generate or test correctly after 2 attempts, mark it Blocked in tasks.md, log the reason, and continue with non-dependent tasks. Return to blocked tasks after unblocked tasks complete.
5. Progress tracking: Update tasks.md Status column (Pending β In Progress β Done / Blocked) as each task progresses.
Steps
1. Scan project structure and tech stack (or use Phase 0 results).
2. For each task in tasks.md (per execution strategy above), take its linked spec_xxx.md as input.
3. Output per task:
- File list (create vs. modify, with paths)
- Implementation code
- Tests derived from spec Test Points (TP-001 β test function)
- Human-review points β Flexible-tier deviations + all [SPEC-GAP] items
4. Add spec traceability comments at module/class level: // SPEC: spec_auth.md | TASK-002 β enables reverse lookup from code to spec.
For existing codebases: clearly distinguish "new file" vs. "modify existing file" and show diffs for modifications.
β Gate 4: Code Review
Per Expert Review Protocol β Gate 4. Exit: User approves (or auto-approved). Proceed to Phase 4.
Phase 4: Verify
Goal: Confirm generated code satisfies the spec through execution (static compliance is already covered by Gate 4).
4a: Dynamic Verification
Run the following checks in order. Stop and fix if any step fails.
1. Build β Project compiles / bundles without errors.
2. Lint & Type Check β Run linter and type checker (if available). Zero errors required; warnings acceptable.
3. Unit Tests β Execute test suite (pytest, npm test, go test, etc.). Map each TP-ID to pass/fail.
4. Integration Tests β Run integration / E2E tests if defined in tasks.md.
5. Coverage Check β Report test coverage. Flag spec Test Points that have no corresponding test execution.
6. NFR Verification β If requirements.md defines measurable NFRs (response time, throughput), run benchmarks and compare. Log results even if not blocking.
7. Manual Test Checklist β For tasks marked AI-Auto: No in tasks.md, generate a manual test checklist with steps and expected results for the user to execute.
4b: SPEC-GAP Resolution
For each [SPEC-GAP] from Phase 3: Accept (update spec) / Reject (fix code) / Defer (add to backlog).
4c: Implementation Map Update
After all tests pass, update the ## Implementation Map section in each spec_xxx.md with the actual code file paths and function/class names. This enables reverse lookup from spec to code.
Output & Transitions
Exit condition: All items pass, or user acknowledges remaining gaps.
Workflow completion (initial build): If this is the initial build and no further changes are planned, update status.md: mark all phases complete, remove the Initial Build Progress table, and present a summary to the user (features built, test pass rate, deferred items count).
Phase 5: Evolve β New Features & Changes
Goal: Add new capabilities or modify existing ones while keeping all specs in sync.
Key rule: Always update the spec BEFORE updating the code. Every change goes through specs/changes/.
Step 1: Classify the Work
| Type | Criteria | Action |
|------|----------|--------|
| New Feature | Independent business value, new interfaces/models | Create specs/changes/FEAT-NNN-name/, run full Phase 1β4 within it |
| Change / Enhancement | Modifies existing feature behavior | Create specs/changes/CHG-NNN-name/, write delta spec, run Phase 2dβ4 |
| Trivial Fix | Single spec file, single section, no interface/model change | Update trunk spec directly with changelog entry, skip change dir |
Step 2: Overlap Check
Before creating the change directory, run Overlap Check against all In-Progress changes listed in specs/index.md. If overlapping Target Specs are found, warn the user and agree on a resolution strategy before proceeding.
Step 3: Work Within the Change Directory
For Features: run the full workflow (Phase 1β4) inside specs/changes/FEAT-NNN/.
For Changes: write a delta-format spec.md (ADDED / MODIFIED / REMOVED), then run Phase 2dβ4.
For Changes that add/remove screens, modify navigation structure, or alter primary interaction patterns (e.g., forms β tables): also run Phase 2b to update design-preview/.
Path rule: All Phase 1β4 outputs go into the change directory, not the trunk. For example, Phase 2a produces specs/changes/FEAT-NNN/design.md, not specs/design.md. The trunk is only updated during Step 4 (Merge to Trunk).
Nesting rule: Changes are always flat β never create a change inside another change directory. If FEAT-NNN's implementation reveals the need for an additional feature, create a sibling FEAT-NNN+1 at the top level (specs/changes/FEAT-NNN+1-name/) and add a dependency note in both tasks.md files.
Apply the same review gates as the main workflow, scoped to the change:
Step 4: Cross-Feature Impact Analysis
Before generating code, analyze impact across ALL trunk specs:
Present impact analysis to the user for confirmation.
Step 5: Merge to Trunk
After code is verified (Phase 4 passed):
1. (Features only) Copy changes/FEAT-NNN/spec.md to specs/spec_.
2. Generate delta.md β merge instructions listing every trunk file/section to update.
3. Apply delta to trunk specs (specs/*.md): insert ADDED content, replace MODIFIED sections, remove REMOVED items.
4. Add changelog entries to every modified trunk file.
5. Update specs/index.md with the change reference.
6. Commit all trunk updates atomically: spec: merge FEAT/CHG-NNN to trunk.
7. Move change directory to specs/changes/archive/.
For full lifecycle details, merge rules, and scaling guidance, see Spec Lifecycle Management.
Cross-Phase Guidelines
specs/status.md (see template). Update at each phase end with current phase, gate results, and deferred item counts. On session start, read specs/status.md first to restore context.spec_xxx.md + related design.md sections β not all spec files at once.specs/status.md.Error Recovery
| Scenario | Recovery Action |
|----------|----------------|
| Phase 3: Task fails after 2 attempts | Mark task Blocked in tasks.md, log root cause, continue with non-dependent tasks. After all other tasks complete, revisit blocked tasks β may require spec revision (back to Phase 2d). |
| Phase 4: Tests fail | Categorize: spec bug (fix spec then re-generate) vs. code bug (fix code, re-run tests). Do not loop more than 3 fix-verify cycles per task β escalate to user. |
| Phase 4: Test environment unavailable | Generate manual test checklist, document expected setup, and mark verification as Pending-Env in status.md. Proceed with remaining phases that don't require the environment. |
| SPEC-GAP: Cannot decide autonomously | Tag as [SPEC-GAP-BLOCKED], implement a safe no-op or error response as placeholder, and batch all blocked gaps for user decision before Phase 4 verification. |
| Phase 5: Delta merge conflict | Follow conflict handling in spec-lifecycle.md. Never force-overwrite trunk β always present both versions to the user. |
| Cross-session context loss | Read specs/status.md + last completed artifacts (see Session Start). If status.md is missing or stale, scan specs/ directory structure and tasks.md status to reconstruct state. |
| Phase 1: Requirements deadlock | If the user cannot decide after 3 clarification rounds, present a default recommendation with rationale. Ask for explicit approval or override. Do not loop indefinitely. |
| Phase 2: Design deadlock | If two design options are equally viable, document both in ADR format (pros/cons/consequences), provide a recommended option, and ask the user to decide. Limit to 2 discussion rounds, then adopt the recommendation if no response. |
Templates